1, when the air duct and dust removal equipment, heating equipment and so on before connection, should be installed after the equipment, according to the actual mapping drawings for prefabrication and installation.
2、當山東通風管道加工與風機連接時,應在進出風口處加軟接頭,其軟接頭的斷面尺寸應與風機進出風口一致。軟管接頭一般可采用帆布、人造革等材料,軟管長度不宜小于200,松緊度應適宜,柔性軟管可緩沖風機的振動。
2, when Shandong ventilation pipe processing and fan connection, should add soft joint in the inlet and outlet, and its soft joint section size should be consistent with the fan inlet and outlet. Hose joint can generally use canvas, artificial leather and other materials, hose length should not be less than 200, tightness should be appropriate, flexible hose can buffer the vibration of the fan.
3、當水平風道高度在4m以上時,安裝人員應系帶。腳手架或移動式支架上的跳板應固定好,跳板寬度應符合規(guī)范,在腳手架上的安裝人員宜攜工具袋,防止工具或電鉆等物墜落傷人。
3, when the horizontal air duct height is above 4m, the installation personnel should fasten the seat belt. Scaffolding or movable scaffolding should be fixed on the springboard, the width of the springboard should comply with safety standards, the installation staff on the scaffolding should carry the tool bag, to prevent tools or electric drills and other things falling injury.
4、風道安裝時,進、出風日宜在風道預制時開出洞口,如需在安裝完畢的風道上現開風口,其接口處應嚴密。
4, air duct installation, into and out of the open hole in the air duct should be prefabricated, if installed in the air duct on the open air, the interface should be tight.
5、雙吊桿支架在風道就位后,應保證橫擔平直,吊桿不扭轉,雙吊桿受力均勻。
5, the double boom support in the wind in place, should ensure that the cross arm flat, the boom is not reversed, double boom uniform force.
6、當輸送含凝結水或含濕量較大的氣體時,其水平管道宜設有坡度,并在低點處接排水管。安裝時風道底部不宜出現縱向接縫,對底部有接縫處應進行密封處理。
6, when conveying water containing condensate or larger moisture content, the horizontal pipeline should have a slope, and at the low point to connect the drain pipe. The longitudinal joint should not be installed at the bottom of the air duct, and the joints at the bottom should be sealed.
7、對輸送易燃、易爆氣體的鋼板風道,在風道連接法蘭處應安裝跨接線,并與靜電接地網連接。
7, the transmission of flammable and explosive gas steel plate air duct, in the air duct connecting flange should be installed across the wiring, and connected with the electrostatic grounding grid.
本文由山東通風管道加工友情奉獻.更多有關的知識請點擊:http://youbaidu.net/我們將用的技術.真誠的態(tài)度.為您提供為的服務.更多有關的知識我們將會陸續(xù)向大家奉獻.敬請期待.
In this paper, the processing by the Shandong friendship ventilation pipeline dedication. More related knowledge: Please click http://youbaidu.net/ we will use the most advanced technology. The most sincere attitude, to provide you with the most comprehensive service. More related knowledge and we will continue to offer. Please look forward to.